1. Application / Description
For Vetter this project was a huge challenge due to the compact installation of 16 systems in three tunnel sections. Beside of engineering of the cable laying technique the entire cable installation material was supplied and mounted in the tunnel. More than 150 tons of steel fittings for huge roller arches or small cable fittings were deliv-ered by truck to the site in Luxemburg. The entire material was mounted in the tunnel by 12 technicians within a time frame of approx. 14 weeks.
2. Technical data
Project-No. | 291.504.30 | |
---|---|---|
Type | Galerie Technique Luxembourg | |
Year | 2008-2011 | |
Customer | Consortium Luxembourg, NKT | |
Voldtage range | KV | 20-220/AC |
Installation length | m | 770 |
Total cable length | m | 10.000 |
Number of systems | St. | 16 |
Installation location | Tunnel | |
Type of installation | Wall mounting | |
Cable weight | Kg/m | 13-35 |
Cable diameter | mm | Up to 150 |